Sections:
Well Setup
Tie-In
Svy Log
Target
Drill Params
Projection
Anti-Collision
Personnel
🗂 Well Archive ▾
🗑 Clear All
Save
🗑 Clear & start fresh
Expected format:
Columns:
MD, Inc, Azi
—
No header row
📁 Browse for CSV File...
Import
Cancel
Well Setup
Add to email
B
F
Hide ▴
Rig Name
Well Name
Well Section
Well Plan #
Section TD (ft)
BHA #
Motor Bend
°
Svy Offset (ft)
Gamma Offset (ft)
+ Add parameter
Tie-In Survey
Hide ▴
Depth (ft)
Inc (°)
Azi (°)
TVD (ft)
N/S (ft)
E/W (ft)
VS (ft)
VS Azimuth Direction (° from North)
Required for correct VS. If blank, VS shows —.
Survey Log
Add to email
B
F
Hide ▴
Most recent survey
▾ Show all surveys
Click SD / Inc / Azi to edit. Changes recalculate downstream.
#
SD
Inc
Azi
TVD
VS
N/S
E/W
DLS
Add survey
Svy Depth (ft)
Inc (°)
Azi (°)
+ Add
At survey point
A/B & L/R
N/S & E/W
Above / Below
Left / Right
Target
Add to email
B
F
Hide ▴
Target Name
Target TVD (ft)
Target Azimuth (°)
Target Inclination (°)
+ Add parameter
Drilling Parameters
Add to email
B
F
Hide ▴
Temperature (°F)
Gamma (API)
Slide Seen
Slide Ahead
Rot. Speed (RPM)
Rotating ROP (ft/hr)
Sliding ROP (ft/hr)
+ Add parameter
Projection to Bit
Add to email
Auto straight-line proj
B
F
Hide ▴
Depth (ft)
Inc (°)
Azi (°)
TVD (ft)
Above/Below
Left/Right
Build Rate (°/100ft)
Motor Yield (°/100ft)
+ Add parameter
Anti-Collision
Add to email
B
F
Hide ▴
Well / Section / Hard Line
Distance (ft)
Sep. Factor
+ Add row
Personnel on Location
Add to email
B
F
Hide ▴
Role
Name
Phone
+ Add person
📧 Email Preview
Drag to reorder
📋 Copy to Clipboard — Paste into Email
Fill in well setup and add a survey to see preview...
Color
Reset to default